GeoEngineers provided a full range of biological and geological permitting support services to upgrade 34 miles of electrical transmission line with fiber optic cabling. The magnitude of this project—which included nine jurisdictional authorities—required more complex permitting documentation and agency coordination than usual, as well as robust Geographic Information System (GIS) database capabilities to manage the volume of collected data.
For each jurisdiction, GeoEngineers used GIS to illustrate the spatial relationships between wetland and stream features, regulated buffers and planned improvements, and coordinated with agency staff at the local, state and federal level to achieve permit approval in time for construction.