GeoEngineers provided expert geotechnical engineering and horizontal directional drilling (HDD) design and construction consulting services for three crossings along the proposed Phase III expansion of the current Gulfstream Natural Gas pipeline system in Florida. The HDD installations were part of 34 miles of new 30-inch-diameter pipeline.
The three HDD crossings the team designed were located within five miles of each other, near the eastern shore of Lake Okeechobee. Their crossing lengths were 2,700, 1,985 and 1,650 feet.