Steve Spencer Joins GeoEngineers as Principal Engineer
Steve Spencer, PE, recently joined GeoEngineers Inc. as a principal geo-structural engineer and key member of the firm’s new national Construction Design Team. Over the past three decades, Mr. Spencer has served as lead engineer for more than 75 marine, underground and foundation design projects. He carved out a reputation as a design engineer for […]
Clean Water Project Wins National APWA Award
The American Public Works Association (APWA) gave a National Project of the Year Award to GeoEngineers’ Oak Harbor Clean Water Facility project. The state-of-the-art water treatment center won in the $75 million+ environmental category. This is the second award for the project, following the Washington APWA’s recognition of Oak Harbor for their state Project of […]
HDD on the Mississippi: What is it?
Horizontal Directional Drilling (HDD) has a number of advantages over traditional pipeline crossing solutions. Learn the basics of this trenchless pipeline solution and how it’s used along the Mississippi river in this short educational video featuring Senior Civil Engineer Jamie Vincent.
Drilling in the River: Geotechnical Investigations in the Mississippi and Beyond
Reliable drilling investigations are the cornerstone of geotechnical work. The soil data our drill teams gather is the basis of most of GeoEngineers’ geotechnical designs and recommendations. Even in ideal conditions, drilling operations can be challenging and unpredictable. But when we need soil information from below a river bottom it requires a team of exceptional […]